Coal Industry
Mining & Natural Resources
Infrastructure Construction
2009
Full project details

Local Government Engineering Department (LGED): Road Roughness Survey (2009)
Collection data of some 80,000 KM of LGED Roads using survey equipment to measure the quality of THE roads managed by LGED. Processing acquired data for further use.

Design and engineering
An iconic building
Logistics and DfMA
Delivery and maintenance
An iconic building

The project drew on multidisciplinary strengths across Laing O’Rourke’s rail and infrastructure business units.

At its peak, the project employed more than 300 people from Laing O’Rourke, Centennial Coal and partner companies across the design, construction, operations and maintenance phases.

Logistics and DfMA

Through close liaison with the Australian Rail Track Corporation (ARTC), Laing O’Rourke negotiated a target incentive mechanism, mitigated interface risks and reduced program inefficiencies.

By providing integrated design and construction services, and preparing concept and preliminary designs and budgets as early as possible, Laing O’Rourke completed the project four months ahead of schedule.

The results